By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Architectural Concept Design Collection
  • Architecture
    • Architecture Project
    • Custom Building
    • House Design
    • Master Plan
    • Remodeling
    • Commercial
    • Education
    • Hospitality & Retail
    • Hotels
    • Residential
  • Interior Design
    • Carpets – Flooring
    • Fine Furniture
    • Lighting
    • Project Profile
  • Kitchen & Bath
    • Bath Products
    • Design – Remodeling
    • Interior Products
  • Home Renovating
    • Advice
    • How-To
    • Renovating Buying Guides
    • Products
    • Furniture
  • Landscape Design
    • Landscape Project
Căn nhà đẹp
Architectural Concept Design CollectionArchitectural Concept Design Collection
Font ResizerAa
Search
Follow US
© Foxiz News Network. Ruby Design Company. All Rights Reserved.
Architectural Concept Design Collection > Architecture > Architecture Project > Small Bridge in Shenggaiying Village, Inner Mongolia/Daliangzao Architecture and Environment + Inner Mongolia Art Institute | Goode Design Network
ArchitectureArchitecture ProjectLandscape DesignLandscape Project

Small Bridge in Shenggaiying Village, Inner Mongolia/Daliangzao Architecture and Environment + Inner Mongolia Art Institute | Goode Design Network

admin
Last updated: 23/11/2026 5:52 AM
admin
Share
19 Min Read
SHARE

thanks fromDaliangzao Architecture and Environment (Contact email: daikosha2024@163.com) + Inner Mongolia Art Institute Share on gooood. More about:DAIKOSHA on gooood + Inner Mongolia Arts University on gooood
Appreciation towards DAIKOSHA Architecture and Environment (contact: daikosha2024@163.com) + Inner Mongolia Arts University for providing the following description:

The design of the small bridge in Shenggaiying Village is not a simple new construction, but an original site update based on the use problems of the original bridge. The design needs to simultaneously respond to the needs of flood drainage safety, villagers’ access, construction efficiency and village public space, and use the precision, lightness and order of the steel structure to re-establish the relationship between the bridge, rivers, roads and village life.

The design of the Small Bridge at Shengaiying Village is not a straightforward new construction, but an in-situ renewal developed in response to the operational problems of the original bridge. The design addresses multiple requirements simultaneously: flood discharge safety, pedestrian access for villagers, construction efficiency and the public space of the village. Leveraging the precision, lightness and formal order of steel structures, it redefines the relationship between the bridge, the river, the roadway and village life.

▼Small Bridge overview, Small Bridge overview

Side view by day

In-situ update: moving from a heavy solid bridge to a lightweight and open structure
In-situ Renewal: From Massive Solid Bridge to Lightweight Open Structure

The original bridge is a relatively thick solid bridge, which blocks the water flow when flash floods come, affecting the normal flood drainage at the bridge location. The bridge has repeatedly experienced problems under the action of floods. Although it has been repaired several times, it is still difficult to maintain a safe and reliable condition. Therefore, the new plan is not to repair or restore the original form, but to build a new bridge at the original bridge site that can adapt to the hydrological conditions of the site after the original bridge is demolished. Rebuilding on the original site means that the design must face up to the existing problems: the bridge must not only meet the basic needs of villagers for crossing the river every day, but also change the water-blocking condition of the original physical bridge. The shift from “heavy and closed” to “light and transparent” has become the primary starting point for the structure and form of the new bridge.

▼The original bridge and demolition site, The original bridge and demolition site

Original bridge and demolition site

The original bridge featured a relatively massive solid superstructure, which obstructed water flow during flash floods and impaired normal flood discharge at the crossing. Subjected to repeated flood impacts, the bridge suffered recurring defects. Despite several repairs, it could not sustain a safe and reliable service condition. Accordingly, the new proposal is not a patchwork or restoration of the original form. Instead, after demolition of the existing bridge, a new crossing is constructed on the same site to accommodate the hydrological conditions of the location. In-situ reconstruction means the design must squarely address the existing problems: the bridge should not only meet villagers’ daily need to cross the river, but also eliminate the flow-blocking effect of the original solid superstructure. Shifting from “massive and enclosed” to “lightweight and permeable” thus becomes the primary starting point for the structural and formal generation of the new bridge.

▼Small Bridge exterior view

Day view/Day view

Lightweight construction: shorten on-site construction period with prefabricated assembly
Lightweight Construction: Prefabrication for Faster On-Site Build

Before the renovation, the original bridge still carried daily traffic for villagers and was an important route for cross-strait communication. If long-term, large-scale on-site construction is adopted, it will not only increase the difficulty of transportation organization, but will also continue to affect villagers’ travel. Therefore, shortening the on-site construction period and reducing the occupation of existing traffic paths have become realistic conditions that the plan must respond to. The design adopts a lightweight steel structure system, and takes “factory processing, on-site assembly, and overall hoisting” as an important principle of the construction organization. The bridge components are cut, processed and pre-assembled in the factory as much as possible, while module hoisting and node connection are the main tasks on site to reduce long-term, continuous heavy workload operations. By moving the main work forward to the factory, on-site construction is compressed into a relatively clear process of dismantling, hoisting and connecting, thereby improving installation efficiency and reducing the interference of material stacking, temporary facilities and construction noise on village life. Lightweight does not mean the weakening of structural expression, but through clear force relationships and component divisions, effective spans can be completed with less material, making rapid construction and lightness two aspects of the same set of design logic.

▼Sketch and model, Sketch and model © DAIKOSHA Architecture and Environment/Inner Mongolia Art Institute

sketch copy

d009a8c42a2cf9b52c505cfa9a0f5475

Prior to the renewal, the original bridge still served as a vital passage for villagers’ daily travel, supporting regular movement between the two riverbanks. Prolonged, large-scale on-site construction would not only complicate traffic organization but also cause persistent disruption to villagers’ commutes. Therefore, shortening the on-site construction period and minimizing the occupation of the existing access route have become imperative practicals that the scheme must address. The design adopts a lightweight steel structure system, with “factory fabrication, on-site assembly and integral hoisting” as a core principle of construction organization. Bridge components are cut, fabricated and pre-assembled in the factory to the fullest extent possible, while on-site work focuses on modular hoisting and joint connection, reducing long-term, continuous labor-intensive operations. By shifting the majority of construction work to the factory, on-site tasks are condensed into a streamlined process of demolition, hoisting and connection. This improves installation efficiency and reduces disturbances to village life caused by material stacking, temporary facilities and construction noise. Lightweight construction does not mean a diminished structural expression. Instead, through clear load-bearing logic and a defined functional division of components, it achieves effective spanning with minimal material use, making rapid construction and a light visual identity two complementary aspects of the same design logic.

▼Exterior close view

View from the other side

Close view of the deck/ Close view of the deck

Transparent bridge: reserve more space for flash floods to pass through
Permeable Bridge: Enhanced Flow Clearance for Flash Floods

The site usually has limited water flow demand, but when flash floods occur, a large amount of water needs to pass through in a short period of time. In response to the problem that the original bridge’s physical closure affected flood drainage, the new bridge regards “transparency” as an important connection point between structural safety and spatial form. The arc-shaped main beams, V-shaped supports and open railings together form a frame system with gaps. There are no continuous closed solid blocks below the bridge deck, making the bridge visually light and transparent and leaving more space for water to pass through. The open interface formed between the vertical and horizontal components is conducive to reducing the bridge’s obstruction to the water flow, reducing the new bridge’s intervention in the original river crossing conditions, and improving the bridge’s water crossing adaptability during the flood season. The bridge is therefore no longer just a structure pressed against the terrain, but a lightweight infrastructure erected between the river banks, allowing wind, water and sight to pass through.

▼Exploded axonometric analysis diagram © DAIKOSHA Architecture and Environment/Inner Mongolia Art Institute

11 18 120927 copy

Under normal circumstances, the water flow at the site is modest, yet flash floods demand a large discharge capacity within a short timeframe. To address the flood discharge obstruction caused by the solid, enclosed form of the original bridge, the new design takes permeability as a critical link between structural safety and spatial form. Curved main girders, V-shaped supports and open railings together form a framed system with ample voids. No continuous solid mass is placed below the bridge deck, which keeps the structure visually light and transparent while reserving more space for water to pass through. The open interfaces between longitudinal and transverse members help reduce the bridge’s obstruction to flow, minimize its interference with the original discharge capacity of the river channel, and improve the bridge site’s flow adaptability during the flood season. As a result, the bridge is no longer merely a bulky structure resting on the terrain, but a lightweight infrastructure spanning the riverbanks that allows wind, water and sightlines to pass through.

▼Aerial view by night

Aerial view by night

Structure is form: curved beams, V-shaped supports and five sections of bridge deck create an overall image
Structure as Form: Curved Girders, V-Supports & 5-Section Deck

The surrounding villages have a rustic environment and lack recognizable public landscapes. The design hopes that the bridge itself will form a new visual focus, but this novelty does not rely on additional decoration, but comes directly from the structure itself. The arc-shaped main beam forms a soft and continuous lower profile, and the V-shaped vertical support forms a powerful rhythm with an upward attitude. Curvature and straightness, lightness and weight, continuity and repetition are contrasted with each other, making the force path become the basis for form generation at the same time. The main traffic bridge deck is divided into five sections in compliance with the overall structure. Each section is relatively independent and forms a complete path through continuous connections. The five-section division facilitates processing, transportation and hoisting, and also allows the bridge deck slope to more flexibly fit the spatial scale determined by the arc-shaped main beam. Pedestrians and bicycles gradually ascend, transition and descend along the bridge deck, transforming the height changes caused by the arching of the structure into a soothing and continuous traffic experience, achieving the unity of structure, form and use scale.

The surrounding village retains a modest, rustic fabric with little in the way of defining public landscape features. The design seeks to position the bridge as a new visual anchor within the village, its identity drawn not from applied ornament but directly from the inherent logic of its structure. The curved main girders trace a soft, continuous profile along the underside of the deck, while the upward-sweeping V-shaped vertical supports establish a rhythm of quiet structural strength. The dialogue between curve and line, lightness and weight, continuity and repetition ensures that the Load paths double as the very foundation of the bridge’s formal language. The main deck, aligned with the overall structural logic, is articulated into five segments: discrete as individual units yet continuous in sequence, together forming an unbroken crossing path. This five-segment configuration streamlines fabrication, transportation and hoisting, while also allowing the deck gradient to flexibly conform to the spatial geometry defined by the curved main girders. Pedestrians and cyclists move through a gradual rhythm of ascent, transition and descent along the deck, turning the elevation shifts of the arched structure into a gentle, seamless traversal experience. In doing so, the design achieves a coherent unity of structure, form and human scale.

▼Night view

Night view/Night view

Side view by night

Public signs and public spaces in villages: from river-crossing passage to stay, viewing and communication
Landmark & ​​Communal Space: From Crossing to Place of Rest, View & Encounter

The new bridge is not only a path across the river, but also hopes to become a public sign and public space in the daily life of the village. The bridge deck adopts the organizational method of “passage in the center and stays on both sides”: a continuous and clear circulation axis is maintained in the middle, which mainly serves pedestrian and bicycle traffic; on both sides, a five-section platform is set up to form a number of appropriately sized and buffering stay spaces without affecting the main line. The five sections of platforms unfold sequentially along the rhythm of the bridge body, echoing the changes in structural units, railings and the undulations of the bridge deck. They are both a spatial transition from passage to stay and a micro-public space on the bridge. Villagers can rest, wait, watch or chat here for a short time. The act of crossing the river in a hurry gives them the possibility to stop and meet. The segmented treatment avoids the sense of continuous closure of the platform, allowing the line of sight to still penetrate freely between the bridge deck, the river and both banks.

More than a mere river-crossing route, the new bridge is conceived as both a public landmark and a communal space woven into the everyday life of the village. The deck adopts a layout of central circulation with side resting zones: the central section retains a continuous, unobstructed circulation axis dedicated to pedestrians and cyclists, while five-segment platforms on both sides create a series of appropriately scaled, transitional resting spaces, all without impeding the main flow of movement. The five platform segments unfold sequentially along the bridge, in dialogue with the structural bays, railing articulations and deck undulation. They serve as both spatial transitions between circulation and repose, and miniature communal nodes atop the crossing. Villagers may pause here to rest, wait, take in the views or converse, transforming the once-hurried act of river crossing into an opportunity for stillness and casual encounter. This segmented configuration avoids a sense of continuous enclosure, allowing sightlines to permeate freely between the deck, the river and both riverbanks.

▼ Close-up aerial view at night

Lighting detail of the deck

Lighting detail of the deck

During the day, the open structure incorporates the sky, riverbank and village views, and the curved beams and V-shaped supports form a new image that is easy to recognize; at night, lights attached to the components outline the outline of the bridge, giving it a warm recognisability while maintaining lightness. As a result, the small bridge is no longer just a transportation facility that replaces the original bridge, but has become a village public space where you can pass, stay, view, and meet neighbors.

By day, the open, permeable structure frames views of the sky, riverbanks and the village fabric, with the curved girders and V-shaped supports forging a distinct, recognizable landmark identity. By night, lighting integrated into the structural members delineates the bridge’s silhouette, lending it a warm, legible presence while preserving its inherent lightness. The small bridge thus transcends its function as a replacement river-crossing facility, evolving into a village communal space that supports circulation, repose, viewing and casual encounters among neighbors.

▼Night view detail

Close-up night view/ Close-up night view

Project name: Daqingshan Street Office River Emergency Water Damage Repair Project
Project location: Shenggaiying Village, Xincheng District, Hohhot City, Inner Mongolia Autonomous Region
Construction unit: Daqingshan Street Office, Xincheng District, Hohhot City
Design company: DAIKOSHA Architecture and Environment/Inner Mongolia Art Institute
Construction drawing design: Zhicheng Construction Design Co., Ltd.
Construction unit: Inner Mongolia Zhongmu Construction Engineering Co., Ltd.
Project completion year: 2026.10
Chief architect: Xu Qiang
Design team: Tian Zhuangjie/Du Long/Qi Xiaohai/Du Fang/Ma Linfeng/Yue Jiayu/Wang Yichen/Zhou Wenbo
Contact email: daikosha2024@163.com

Project name: River Channel Emergency Flood-Damage Restoration Project of Daqingshan Street Sub-district Office
Project location: Shengaiying Village, Xincheng District, Hohhot, Inner Mongolia
Client: Daqingshan Street Sub-district Office, Xincheng District, Hohhot
Design: DAIKOSHA Architecture and Environment / Inner Mongolia Arts University
Construction drawing design: Zhicheng Jianke Design Co., Ltd
Construction: Inner Mongolia Zhongmu Construction Engineering Co., Ltd
Completion year: 2026.10
Lead architect: Xu Qiang
Design team: Tian Zhuangjie / Du Long / Qi Xiaohai / Du Fang / Ma Linfeng / Yue Jiayu / Wang Yichen / Zhou Wenbo
Contact e-mail: daikosha2024@163.com

MORE: Daliangzao Architecture and Environment (Contact email: daikosha2024@163.com) + Inner Mongolia Art Institute more about:DAIKOSHA on gooood + Inner Mongolia Arts University on gooood



Source: gooood.cn
- Advertisement -
TAGGED:ArchitectureArtBridgeDesignEnvironmentGoodeInstituteMongoliaMongoliaDaliangzaoNetworkShenggaiyingSmallVILLAGE
Share This Article
Flipboard Copy Link

RELATED NEWS

“Garage Dallegret” exhibition, Venice / Supervoid | Goode Design Network

admin

Rabat Royal Theater, Morocco / Zaha Hadid Architects | Good Design Network

admin

Aude-Heverle Community Center, Belgium / KPW Architecten | Goode Design Network

admin

Nested House by Iterare Arquitectos Is a Light-Filled Refuge

admin
Previous Next
- Advertisement -

Always Stay Up to Date

Subscribe to our newsletter to get our newest articles instantly!
[contact-form-7 id="6931ce0" title="Email"]
Architectural Concept Design Collection
Architectural Concepts provides creative and tailored design solutions across architecture, interior design, kitchen and bathroom design, home renovation, and landscape design. We transform ideas into beautiful, functional, and inspiring spaces that reflect each client’s lifestyle and vision.

About us

  • Architecture
  • Home Renovating
  • Interior Design
  • Landscape Design
  • Architecture Project
  • Landscape Project
  • Project Profile
  • Products

Link

  • Asia Pacific Lighting
  • Indoor Lighting
  • Outdoor Lighting
  • Solar Light
  • Cho thuê xe Miền Tây
  • Xe Rental
  • Car Rental
  • Car for Rent

Resouce

  • Finances News
  • Investing News
  • Crypto News
  • Cho thuê căn hộ
  • Hỗ trợ mua nhà
  • Tư vấn mua nhà
  • Tiến độ dự án

Resouce

  • Italy Highlights
  • Italy Attractions
  • Travel to Italy
  • Italy Food
  • Trip Ideas in Italy
  • Đi chơi Miền Tây
  • Mẹo đi làm
  • Mẹo đi xin việc làm
  • Vi Vu Miền Trung
  • Travel in Phu Quoc
  • Phu Quoc High Lights
  • Thing to do in Phu Quoc
Copyright © 2023. Designed by Architectural Concepts..
  • Privacy Policy
Go to mobile version
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?