gratefulPenzel ValierAuthorize gooood to publish the following content. For more information about them, please go to:Penzel Valier on gooood
Appreciation towards Penzel Valier for providing the following description:
The building’s spatial form is shaped by two key design principles. First of all, the design team hopes to avoid the clutter that may have been caused by the original plan: the original plan planned to use a rib-like structure to strengthen the unloading warehouse and process warehouse composed of new and old buildings, extend upward, and continue the construction in the same way. In its place is a coherent and powerful overall form that integrates the different infrastructural components.
The spatial form of the building is shaped by two key design principles. First, rather than reinforcing the delivery and process bunkers – comprising both existing and new structures with ribs, extending them vertically, and continuing the new construction in the same manner as originally planned, we sought to avoid the resulting heterogeneity. Instead, our goal was to develop a cohesive and powerful overall form that seamlessly integrates the different infrastructural components.
▼Architectural panorama, Overall view © Bruno Augsburger

▼Factory building in the landscape, Plant in the landscape © Bruno Augsburger

▼Plant entrance © Penzel Valier

The power plant consists of two clear parts: a solid base that houses the main infrastructure, and the mechanical equipment that sits on it. This layout makes functional relationships clearer and balances the overall proportions of the building. The technical facilities sit on a heavy plinth and are wrapped in a lightweight shell like a car body. A continuous band of glass marks the transition between the two volumes, highlighting their contrast while offering a glimpse into the spectacular machine hall inside.
▼Building axonometric drawing © Penzel Valier

The power plant is organized into two distinct elements: a solid plinth that houses the main infrastructure and the machinery positioned above it. This configuration enhances the legibility of functional relationships while balancing the overall proportions. Resting on the massive base, the technical facilities are enclosed in a lightweight shell- akin to the bodywork of a car. A continuous band of glazing marks the transition between these elements, emphasizing their contrast while offering glimpses into the impressive machine hall.
▼Delivery entrance © Bruno Augsburger

▼Photovoltaic facade and chimney © Bruno Augsburger

▼Cantilever and photovoltaic skin, Cantilever and photovoltaic skin © Bruno Augsburger

▼Unloading and storage space, Delivery and storage hall © Bruno Augsburger

▼Crane and control room, Crane and control room © Bruno Augsburger

▼Grab crane and concrete bunker © Bruno Augsburger

▼Operator room © Bruno Augsburger

The chimney rises from the base and extends upward along the side of the craft hall, with a total height of 80 meters. The viewing platform at the top brings an unexpected and distinctive stance to the building, creating a striking and unique detail.
The chimney emerges from the plinth, rising alongside the process hall to a total height of 80 meters. At its peak, a viewing platform introduces an unexpected yet distinctive architectural gesture, giving the structure a striking and unique detail.
▼Concrete volume and chimney, Concrete volume and chimney © Bruno Augsburger


▼Vertical space, Vertical space © Bruno Augsburger

▼Stairwell, Stairwell © Bruno Augsburger

▼Staircase turning, Staircase landing © Bruno Augsburger


The overall volume appears as a sculptural concrete entity that unifies the different functional components into a single architectural expression. Within this sculptural framework, the craft hall is both a functional and conceptual core. The production process and technical facilities become visible driving forces here, driving the operation of the entire factory. The building thus becomes a distinct and easily identifiable landmark in the open landscape along the Aare River at the southern foot of the Jura Mountains.
The volumetric composition takes the form of a sculptural concrete entity, unifying the various functional components into a singular architectural expression. Within this sculptural framework, the process hall serves as both the functional and conceptual epicenter of the complex. Here, the production processes and technological infrastructure become the visible driving force behind the entire facility. As a result, the building asserts itself as a bold and identifiable landmark within the expansive Aare landscape at the southern foothills of the Jura.
▼Equipment and pipeline, Equipment and pipework © Penzel Valier

▼Production facilities, Process equipment © Penzel Valier

▼Technical equipment space, Technical equipment space © Bruno Augsburger

▼Internal service passage of factory building © Bruno Augsburger

▼Central control room © Bruno Augsburger

▼Ring lighting and interior space, Ring lighting and interior © Bruno Augsburger

▼Interior ceiling detail © Bruno Augsburger

▼Meeting room © Bruno Augsburger

▼Office space © Bruno Augsburger


▼Interior and distant landscape © Bruno Augsburger

▼Window view and installation © Bruno Augsburger


▼Night view, Night view © Bruno Augsburger

▼General floor plan, Site plan © Penzel Valier

▼Ground floor plan © Penzel Valier

▼First floor plan © Penzel Valier

▼Second floor plan © Penzel Valier

▼Third floor plan © Penzel Valier

▼Longitudinal section AA, Longitudinal section AA © Penzel Valier

▼Cross section AA, Cross section AA © Penzel Valier

▼Longitudinal section BB © Penzel Valier

▼Natural stone inlay structure, Natural stone inlay detail © Penzel Valier

Project name: KVA Emmenspitz Zuchwil
Function: Waste-to-Energy Plant and Photovoltaic Power Plant
Location: Emmenspitz, Zuchwil, Switzerland
Owner/Client: Kenova AG
Commission: 2016 Research Project First Place/Study, 1st place, 2016
Project design/ Project planning: From 2017/ From 2017
Start of construction: 2020
Move-in: 2025
Commissioning: 2025
Completion/Completion: 2028
SIA 102 Type & category of structure according to SIA 102: Technical installations, waste-to-energy plant
Performance share according to SIA 102: Architecture 67% share of services
Floor area: 44,000 m²
Building volume: Approx. 410,000 m³
Architecture: Penzel Valier, Zurich
Architecture team: Apostolos Apostolinas, Leonore Daum, Ecem Dönmez, Timon Dönz, Agnes Eklund, Cait Elliott, Jan Erismann, Liam Gerber, Roland Hasler, Christian Klein, Leo Kleine, Magnus Lidman, Christian Penzel, Heinz Rempfler, Sven Semmisch, Johannes Süssbier, Friedrich Tellbüscher, Martin Valier, Philippe Vaucher, Henning Vogel, Daniel Zielinski
Civil engineering: Penzel Valier, Zurich (Project assignment, 1st place); AFRY Switzerland, Zurich (Planning and execution)
Overall Management and Construction: TBF + Partner, Zurich
General planner: TBF+Partner, Zurich
Civil engineering (building construction, special foundation engineering, excavation and structural design): AFRY Schweiz, Zurich
Photovoltaic planning: Sundesign photovoltaic engineering, Stallikon
Landscape architecture: Maurus Schifferli Landschaftsarchitekt, Bern
Process engineering/Process engineering: TBF+Partner, Zurich
HVAC planning: Tri Air, Jona SG
Sanitary planning: Bösch Sanitäringenieure, Dietikon
Electrical planning: Bering, Bern
Building automation/Building automation: TBF+Partner, Zurich
Building physics: Gartenmann Engineering, Zurich
Safety and fire protection planning: Hautle Anderegg und Partner, Ostermundigen
Traffic planning: TBF+Partner, Zurich
Site Management: S+B Baumanagement, Pratteln
Architectural photography (project credits): Bruno Augsburger, Zurich; Dominic Büttner, Zurich
Image credits in this article: Bruno Augsburger; Penzel Valier
Source/Source: Penzel Valier/v2com
Website/Website: www.penzelvalier.ch
Media contact email (Word source): pr@penzelvlaier.ch
Contact email (PDF information) / Contact email (PDF press kit): pr@penzelvalier.ch
More:Penzel Valier For more about them, please go to: Penzel Valier on gooood
Source: gooood.cn