House for the Environment and Biodiversity, Mitry-Mauri, France / Bulle, Poirier & Justman Architectes | Goode Design Network

9 Min Read

grateful Bulle, Poirier & Justman Architectes Share the following content with gooood. For more information about them, please go to: Bulle, Poirier & Justman Architectess on gooood
Appreciation towards Bulle, Poirier & Justman Architectes for providing the following description:

The building is located on the edge of a municipal site and is open or closed to the public depending on the opening hours of the public restaurant, archery range and other activities. It replaces an old go-kart track and the site is surrounded by a grassy slope and has been repurposed by an association of beekeepers who have set up beehives and honey-making sheds on site.

The building stands on the edge of a municipal territory that opens and closes to the public with the hours of the activities gathered there – the communal restaurant, the archery ground. It replaces a former karting track, framed by grassy embankments and already reclaimed by a beekeepers’ association that keeps its hives and honey-making shelters on the site.

▼Timber-slatted façade and deep overhanging roof © Hervé Abbadie

The project combines a honey processing room and a multi-functional hall with a total area of ​​225 square meters. The building sits like a large piece of furniture – or a large beehive – on screw piles so as not to damage the land it occupies.

▼Axonometric view: Timber frame and screw pile foundation,
Axonometric view: timber frame and screw-pile foundations © Bulle, Poirier & Justman Architectes

The program combines a honey house and a multipurpose hall for a total of 225 m². Drawn like a large piece of furniture – or a large hive – the building rests on screw piles so as not to damage the ground it occupies.

▼Meandering paths lead to the House of Environment and Biodiversity,
A winding path leading to the Maison de l’Environnement et de la Biodiversité © Hervé Abbadie

▼Multipurpose hall opening generously to the western landscape © Hervé Abbadie

The building backs onto farmland and opens up to the town: its geometry aligns with the street system and frames the nearby cluster of beehives and the distant church tower.

While it backs onto the cultivated fields, the building opens up to the town: its geometry aligns with the street system and frames both the nearby cluster of hives and, in the distance, the church tower.

▼Restrained openings in the honey house façade © Hervé Abbadie

▼Timber-slatted façade surrounded by meadow © Hervé Abbadie

▼Timber “shelves” and façade construction details © Hervé Abbadie

It was built like a modular kit: the wooden frame was stuffed with insulating straw bales, and the wide interior walls were covered with earthen plaster. The wall and roof structures were prefabricated off-site. The openings on the facade of the honey processing room are restrained, while the west facade is wide open. Its wooden “shelves” will gradually become nests for birds and insects, transforming the facade into a teaching tool.

It is built like a construction kit: a timber frame filled with insulating straw bales, its large interior walls softened by an earth plaster. The walls and roof structure were prefabricated off-site. The honey house facades are pierced with restraint; the west facade, by contrast, opens generously. Its timber “shelves” will gradually be inhabited by bird and insect nests, turning the facade into a teaching tool.

▼Timber structure and entrance beneath the overhang, Timber structure and entrance beneath the overhang © Hervé Abbadie

▼Semi-outdoor walkway and translucent roof, Semi-outdoor walkway and translucent roof © Hervé Abbadie

▼Roof and wooden structure that filter light,
Roof and timber structure filtering daylight © Hervé Abbadie

▼Multipurpose hall opening to the landscape © Hervé Abbadie

▼Honey house and interior corridor © Hervé Abbadie

▼Rhythm of the timber roof slats © Hervé Abbadie

Light-coloured wood, straw and earth, with only a few concrete elements echoing the nearby town, and a hazelnut shell path on an old asphalt driveway: the project softens the transition between farmland and the town center.

Light timber, straw and earth, with only a few concrete elements as signs of the nearby town, and a path of hazelnut shells laid over the old asphalt track: the project makes the transition between farmland and town center a gentle one.

▼Straw wall panels in the off-site prefabrication workshop/Workers placing the straw insulation © Hervé Abbadie

▼Wall and roof components prefabricated in the workshop © Hervé Abbadie

The project originated from a close dialogue between the architect and the owner. The Municipality of Mitri-Moree initiated the project with a streamlined, site-specific procedure, with the brief evolving in terms of use functions, site location, materials and technologies. The architects perfected the details of straw-straw walls, mud plastering and partially translucent roofs, and forego overly complex systems such as geothermal energy or roofs covered with solar panels. The owners accepted an innovative approach that did not yet have technical certification, relied on laboratory tests carried out by the French straw bale construction network (Réseau Français de la Construction Paille) and sought additional funding for a budget totaling 900,000 euros (excluding VAT).

The project grew out of close dialogue between architect and client. Launched by the City of Mitry-Mory through a simple adapted procedure, the brief kept evolving – in its uses, its position on the site, its materials and its techniques. The architects refined the detailing of earth plaster on straw walls and of a partly translucent roof, and gave up over-sophisticated systems such as geothermal energy or a roof covered with solar panels. French straw building network (Réseau Français de la Construction Paille), and sought additional funding for a total budget of €900,000 excl. VAT.

▼Buildings and winding paths in the twilight,
Building and winding path at dusk © Hervé Abbadie

▼General plan: between farmland and town center,
Site plan: between farmland and the town center
© Bulle, Poirier & Justman Architectes

▼Colour-annotated floor plan © Bulle, Poirier & Justman Architectes

▼Wall details: straw insulated wooden wall and screw piles,
Wall detail: straw-insulated timber wall and screw piles © Bulle, Poirier & Justman Architectes

Project name: Maison de l’Environnement et de la Biodiversité
Project location: Mitry-Mory, Seine-et-Marne, France
Owner: Mitri-Mori Municipality
Function: Community center, including multi-purpose hall and honey processing room
Building area: 225 square meters
Construction cost: 850,000 euros (excluding VAT)
Completion time: June 2026
Construction method: wooden frame, straw bale insulation, soil plastering; off-site prefabrication; screw pile foundation
Architect in Charge: Bulle, Poirier & Justman Architectes
Structural Engineering: BGEA
Cost consultant: DS2E
Environmental Engineering: EXEO
Timber framing and prefabrication: CMB Construction Millet Bois
Photography: Hervé Abbadie
Website: www.bullepoirierjustman.archi
Email: bpj@bullepoirierjustman.archi

Project: Maison de l’Environnement et de la Biodiversité
Location: Mitry-Mory (Seine-et-Marne), France
Client: City of Mitry-Mory
Programme: Community hub with a multipurpose hall and honey house
Floor area: 225 m²
Construction cost: €0.85M excl. VAT
Completion: June 2026
Construction: Timber frame, straw-bale insulation, earth plaster; off-site prefabrication; screw piles
Architect (lead): Bulle, Poirier & Justman Architectes
Structural engineering: BGEA
Cost consultant: DS2E
Environmental engineering: EXEO
Timber frame / prefabrication: CMB Construction Millet Bois
Photographs: Hervé Abbadie
Website: www.bullepoirierjustman.archi
Email: bpj@bullepoirierjustman.archi

More:Bulle, Poirier & Justman Architectesfor more about them, please go to: Bulle, Poirier & Justman Architectess on gooood



Source: gooood.cn
Share This Article
Exit mobile version